|
New Airport Line of the Beijing Subway () is a rapid transit rail line under planning in Beijing connecting the Beijing Daxing International Airport with the downtown of Beijing.〔(Chinese)("新机场线城区起点为牡丹园站" ''Beijing Daily'' ) 2014.2.9〕 ==History== In 2011, when transport infrastructure Beijing Daxing International Airport was being considered, the media reported the plan to connect the airport with 2 subway lines by "...extending the Daxing Line southwards and adding an entirely new line connecting the metropolitan area."〔(Chinese)("第二机场将通两条地铁线 一条高速路将连接市区" ''Qianlong'' ) 2011.4.2〕 In 2012, there were reports of the plan including an "airport express," Line 4 extension, and R4 line extension to connect with Beijing Daxing International Airport.〔(Chinese)(''Caijing'' ) 2013.6.6〕 In 2013, the map released by the Beijing Municipal Commission of Urban Planning contained the route of "New Airport Express (新机场快线)," which starts from Beijing South Railway Station, connecting at Caoqiao and Xingong, and extending southwards towards the Beijing Daxing International Airport.〔(Chinese)("北京地铁16号线车站设计方案展示" ) 2013.4.25〕 In 2014, more details of the New Airport Line were reported.〔(Chinese)("新机场线城区起点为牡丹园站" ''Beijing Daily'' ) 2014.2.9〕 * The length of the line is going to be 59.2 km with the construction beginning at the end of 2014. * There are going to be 5 stations, though some experts siting that more stations need to be added. #Mudanyuan 牡丹园 (''Line 10'') #Jinrongjie 金融街 #Caoqiao 草桥 #Nanyuan 南苑 #New Airport 新机场 * At Mudanyuan and Caoqiao station, passengers can complete the boarding process 24 hours prior to flight departure time. * The maximum speed is going to reach 120 km/hour, surpassing the Airport Express, with the maximum speed of 110 km/hour, as the fastest subway line in Beijing. * The line is going to open with the Beijing Daxing International Airport in 2018. Further reports in 2014 stated that the government was going to invest 19.7 billion RMB in the New Airport Line〔(Chinese) ("北京新机场轨道交通线将开工 总投资197亿元" ''中国市政工程网'' ) 2014-03-25〕 and a plan with Cigezhuang(磁各庄) station replacing Nanyuan station and 2 stations at the airport (Terminal 1 and 2).〔(Chinese) (北京新机场地铁4年后与新机场同期开通" ''中国新闻网'' ) 2014-11-26〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「New Airport Line, Beijing Subway」の詳細全文を読む スポンサード リンク
|